
It’s easy to understand how a demolition crew on a Pine Street sidewalk, while trying to remove a clock base, wound up puncturing the roof of Westlake Station.
The top of the station begins only 3 feet deep.
Not only that, but the clock’s foundation was integrated into the cut-and-cover station’s own structure, attached by steel rebar, when tunnel builders poured a huge slab of concrete in 1988 forming the lid.